Skip to content
Ep.1174 - Advanced Pull Planning episode artwork

Sep 25, 2024 11 min

Ep.1174 - Advanced Pull Planning

from Elevate Construction Hosted by Jason Schroeder

In this podcast we cover: The normal pull planning process. How to dig deeper of the durations are not accurate. In this episode, I share my insights on advanced pull planning and why the traditional approach often falls short. I explain how relying only on average durations can create sandbagged schedules and destroy zone control. I talk about asking trade partners for their fastest, average, and slowest durations so we can clearly see bottlenecks and optimize the system. I also discuss practical ways to improve constraints, from adding trained crews to using better equipment or work processes. This episode blends the principles of pull planning, line of balance, and takt planning to create a more strategic and reliable process. By identifying constraints and pacing everyone properly, we gain buffers, reduce risk, and accelerate milestones. This conversation is about moving beyond the basics and into a system that delivers confidence, clarity, and measurable results on every project. If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Ep.1174 - Advanced Pull Planning

0:00 11:30

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Elevate Construction?

This episode is 11 minutes long.

When was this Elevate Construction episode published?

This episode was published on September 25, 2024.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Elevate Construction episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.