EP.12 - Planning for the Future
from CUB Tracks Hosted by Citizens Utility Board of Wisconsin
Corey and Tom share their initial thoughts about the Public Service Commission's draft Strategic Energy Assessment as well as the staff memo outlining policy options for the Focus on Energy program. Thought we would just be getting some hot takes, but ended up going down the rabbit hole a bit. Grab a frosty beverage, get comfortable, and enjoy!
Embed this episode
No transcript yet.
Frequently asked questions
How long is this episode of CUB Tracks?
This episode is 38 minutes long.
When was this CUB Tracks episode published?
This episode was published on July 12, 2022.
Can I download this CUB Tracks episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.