Ep.1345 - First Planner System®️ - 23 - Last Planner®️ & Scrum in Design episode artwork

EPISODE · May 20, 2025 · 17 MIN

Ep.1345 - First Planner System®️ - 23 - Last Planner®️ & Scrum in Design

from Elevate Construction · host Jason Schroeder

Mastering Preconstruction Planning with Last Planner & Scrum The Ultimate Design Phase Playbook In this episode, Jason Schroeder breaks down the powerful Last Planner System and Scrum methods how to set milestones, create pull plans, run daily huddles, and keep your design team laser-focused and on track. Discover how to transform vague goals into clear, actionable steps, balance work in progress, and recover from delays without chaos. Learn why visual plans, weekly work sessions, and smart sprint tracking are game-changers for preconstruction success. If you want your design phase to flow smoothly, your team to collaborate seamlessly, and your project to stay on budget and schedule this episode is your blueprint. If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode.  And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).   Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

Episode metadata supplied by the publisher feed · Published May 20, 2025

Embed this episode

NOW PLAYING

Ep.1345 - First Planner System®️ - 23 - Last Planner®️ & Scrum in Design

0:00 17:14

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Elevate Construction?

This episode is 17 minutes long.

When was this Elevate Construction episode published?

This episode was published on May 20, 2025.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Elevate Construction episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!