Skip to content
Ep.1416 - The Last Planner®️ System - Part 1 episode artwork

Aug 27, 2025 20 min

Ep.1416 - The Last Planner®️ System - Part 1

from Elevate Construction Hosted by Jason Schroeder

In this episode, Jason dives deep into the Last Planner System not just to explain it, but to start building a clear, modern, and practical manual that actually works in today's construction environment. Too many of the resources we rely on are the same ones published 10, 20, even 25 years ago. They haven't kept up with the realities of flow, trade collaboration, and the integration of Takt planning. It's time to change that. Here's what we cover: Why the Last Planner must be paired with Takt (not CPM) if you want accurate milestones and real trade flow. The core meetings, deliverables, and behaviors that make the system succeed. How to move beyond outdated "weekly work plans from scratch" and filter commitments from a real production plan. Critical corrections we must make from how we track Percent Plan Complete, to when daily huddles should actually happen. If you're serious about implementing Last Planner the right way with respect for people, reliable commitments, and flow that works, this episode is for you. If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Ep.1416 - The Last Planner®️ System - Part 1

0:00 20:21

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Elevate Construction?

This episode is 20 minutes long.

When was this Elevate Construction episode published?

This episode was published on August 27, 2025.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Elevate Construction episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.