Skip to content
Ep.1419 - The Last Planner ®️System - Part 2 episode artwork

Aug 29, 2025 17 min

Ep.1419 - The Last Planner ®️System - Part 2

from Elevate Construction Hosted by Jason Schroeder

In this episode, Jason took a hard look at the Last Planner System, what works, what doesn't, and why it desperately needs a reset. From daily huddles that prioritize foremen over craftworkers, to the misuse of "constraints" vs. real roadblocks, to static boards that kill flow, we pull no punches in critiquing where our industry is stuck. You'll hear why: Morning huddles waste critical craft time (and what to do instead). Roadblocks must replace "constraints" in our language and practice. Visual boards should drive problem-solving, not just display commitments. Why percent plan complete (PPC) isn't enough, we need new KPIs. Pull planning should always use one sticky per day and avoid batching. Lean systems should evolve, not stagnate. If we want Last Planner 2.0 (or 3.0) to actually deliver, we've got to stop repeating bad habits and start building trust, flow, and clarity on our projects. 🔥 This episode is part critique, part blueprint and if you care about improving how we plan and build, you won't want to miss it. If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Ep.1419 - The Last Planner ®️System - Part 2

0:00 17:15

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Elevate Construction?

This episode is 17 minutes long.

When was this Elevate Construction episode published?

This episode was published on August 29, 2025.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Elevate Construction episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.