Ep.1420 - The Last Planner®️ System - Part 3 episode artwork

EPISODE · Aug 30, 2025 · 19 MIN

Ep.1420 - The Last Planner®️ System - Part 3

from Elevate Construction · host Jason Schroeder

If you've ever struggled with making construction schedules truly reliable, this episode is a must-listen. Jason continues his series on the Last Planner System with a deep dive into the 2020 Benchmark, breaking down what's working, what's missing, and where the industry needs to head next. From field engineering as the backbone of quality and safety, to the real meaning of reliable promises, Jason unpacks how detailed task breakdowns, constraint removal, and full-kit readiness set the stage for project success. He also shares insights on: Why lookahead planning is more than just a meeting, it's a commitment to roadblock-free work. How Percent Plan Complete (PPC) can mislead you, and the better metric you should be tracking. Why integration with Takt planning and flow-based work packaging is essential for the next generation of Last Planner. The Benchmark's push for target value delivery, adaptability, and continuous learning. This isn't theory, it's practical, battle-tested insight designed for builders who want to lead with clarity, reliability, and flow. If you're ready to level up your planning game and see how Last Planner ties directly to Takt and real project delivery, hit play now.   If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode.  And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).   Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

Episode metadata supplied by the publisher feed · Published Aug 30, 2025

Embed this episode

NOW PLAYING

Ep.1420 - The Last Planner®️ System - Part 3

0:00 19:27

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Elevate Construction?

This episode is 19 minutes long.

When was this Elevate Construction episode published?

This episode was published on August 30, 2025.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Elevate Construction episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!