Ep 43 Harbor Cay Condo Construction Collapse
from FAILUROLOGY · host Nicole Imeson & Brian Moynihan
Engineering News – Stretchable Thermometer (2:05) This week’s engineering failure is the Harbor Cay Condo Construction Collapse (6:10). Several issues (13:15) with the design and construction of the concrete slabs and columns led to the collapse of the building before it was even complete. There were consequences (29:25) for everyone involved and a lot of lessons to learn to prevent this from happening again. Check out our new Patreon page for Mini Failure bonus episodes - https://www.patreon.com/failurology Photos/Sources/Summary from this episode - https://www.failurology.ca/ Ways to get in touch Twitter - https://twitter.com/failurology Email - [email protected] Linked In - https://www.linkedin.com/company/failurology-podcast YouTube - https://www.youtube.com/channel/UCh1Buq46PYyxKbCDGTqbsDg
Embed this episode
NOW PLAYING
Ep 43 Harbor Cay Condo Construction Collapse
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.