Ep 43 Harbor Cay Condo Construction Collapse episode artwork

EPISODE · Feb 13, 2022 · 32 MIN

Ep 43 Harbor Cay Condo Construction Collapse

from FAILUROLOGY · host Nicole Imeson & Brian Moynihan

Engineering News – Stretchable Thermometer (2:05) This week’s engineering failure is the Harbor Cay Condo Construction Collapse (6:10). Several issues (13:15) with the design and construction of the concrete slabs and columns led to the collapse of the building before it was even complete. There were consequences (29:25) for everyone involved and a lot of lessons to learn to prevent this from happening again. Check out our new Patreon page for Mini Failure bonus episodes - https://www.patreon.com/failurology Photos/Sources/Summary from this episode - https://www.failurology.ca/ Ways to get in touch Twitter - https://twitter.com/failurology Email - [email protected] Linked In - https://www.linkedin.com/company/failurology-podcast YouTube - https://www.youtube.com/channel/UCh1Buq46PYyxKbCDGTqbsDg

Episode metadata supplied by the publisher feed · Published Feb 13, 2022

Embed this episode

NOW PLAYING

Ep 43 Harbor Cay Condo Construction Collapse

0:00 32:54

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of FAILUROLOGY?

This episode is 32 minutes long.

When was this FAILUROLOGY episode published?

This episode was published on February 13, 2022.

Can I download this FAILUROLOGY episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!