Ep. 46 - Why Most Construction Schedules Fail (And What Needs to Change) episode artwork

EPISODE · May 12, 2026 · 1H 1M

Ep. 46 - Why Most Construction Schedules Fail (And What Needs to Change)

from Construction Conversations · host Build Better Media

In this episode, Franco shares insights on innovative construction scheduling, the role of AI and data, and advice for startups in the industry. Discover how new tools are transforming project management and the importance of humility and focus in building successful construction tech companies. Today's Guest: Franco Giaquinto Check Him Out on Linkedin: https://www.linkedin.com/in/francogiaquinto/ Episode Sponsors: Check Out Trunk Tools: https://trunktools.com/ Check Out ClearStory: https://www.clearstory.build/ Check Out Document Crunch: https://www.documentcrunch.com/

Episode metadata supplied by the publisher feed · Published May 12, 2026

Embed this episode

Ready to play

Ep. 46 - Why Most Construction Schedules Fail (And What Needs to Change)

0:00 1:01:58

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Construction Conversations?

This episode is 1 hour and 1 minute long.

When was this Construction Conversations episode published?

This episode was published on May 12, 2026.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Construction Conversations episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!