Ep. 465 Construction Change Orders: What Contractors Should Know episode artwork

EPISODE · Dec 27, 2024 · 16 MIN

Ep. 465 Construction Change Orders: What Contractors Should Know

from Rancho Mesa's StudioOne™ Safety and Risk Management Network · host Rancho Mesa Insurance Services

Rancho Mesa’s Surety Relationship Executive Anne Wright and Pam Scholefield of Scholefield Law in San Diego, discuss what affects subcontractors and prime contractors when changes occur in their contract. Show Notes: ⁠Subscribe to Rancho Mesa's Newsletter⁠. Scholefield Law Director/Host: ⁠Anne Wright⁠ Guest: Pam Scholefield Editor/Producer: ⁠Megan Lockhart⁠ Music: “A Brand New Start” by TrackTribe, "Home" by JHS Pedals, “News Room News” by Spence © Copyright 2024. Rancho Mesa Insurance Services, Inc. All rights reserved.

Episode metadata supplied by the publisher feed · Published Dec 27, 2024

Embed this episode

Ready to play

Ep. 465 Construction Change Orders: What Contractors Should Know

0:00 16:27

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Rancho Mesa's StudioOne™ Safety and Risk Management Network?

This episode is 16 minutes long.

When was this Rancho Mesa's StudioOne™ Safety and Risk Management Network episode published?

This episode was published on December 27, 2024.

Can I download this Rancho Mesa's StudioOne™ Safety and Risk Management Network episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!