Skip to content
Ep 56 - Lean Practices in Complex Projects: Challenges and Opportunities - Production System Design, Last Planner, Location Based Planning and Control episode artwork

Jun 25, 2025 1 hr 3 min

Ep 56 - Lean Practices in Complex Projects: Challenges and Opportunities - Production System Design, Last Planner, Location Based Planning and Control

from Em Construção Hosted by EM CONSTRUÇÃO

In this episode, we’ll explore these three fronts as applied to complex environments — with multiple scopes, simultaneous interfaces, and tight schedules — highlighting the use of tools such as BIM, Gantt charts, Line of Balance, 360° cameras, multidisciplinary daily hubs, and integrated big rooms. We’ll also discuss the challenges of leadership and resource allocation in dynamic settings, and how well-executed Lean practices can lead to real gains in productivity, control, and value delivery to the client. To talk about the subject, we have with us the Lean Consultant and Innovation Director at LD Consulting Fabrício Vargas

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Ep 56 - Lean Practices in Complex Projects: Challenges and Opportunities - Production System Design, Last Planner, Location Based Planning and Control

0:00 1:03:00

No transcript yet.

Requests help us decide what to transcribe next.

The 48 Laws of Power by Robert Greene (Full Audiobook) Robert Greene Amoral, cunning, ruthless, and instructive, this multi-million-copy New York Times bestseller is the definitive manual for anyone interested in gaining, observing, or defending against ultimate control – from the author of The Laws of Human Nature.In the book that People magazine proclaimed “beguiling” and “fascinating,” Robert Greene and Joost Elffers have distilled three thousand years of the history of power into 48 essential laws by drawing from the philosophies of Machiavelli, Sun Tzu, and Carl Von Clausewitz and also from the lives of figures ranging from Henry Kissinger to P.T. Barnum.Some laws teach the need for prudence (“Law 1: Never Outshine the Master”), others teach the value of confidence (“Law 28: Enter Action with Boldness”), and many recommend absolute self-preservation (“Law 15: Crush Your Enemy Totally”). Every law, though, has one thing in common: an interest in t Alô, Ciência? Alô, Ciência? “Alô, Ciência?” é um projeto voltado para a divulgação científica. Aqui buscamos discutir temas que sejam transversais ao mundo científico levando sempre em conta sua influência e importância em nossa sociedade. AnointedEDU Jermaine Whiteside The AnointedEDU Podcast explores the intersection of research, leadership, governance, education, artificial intelligence, and institutional innovation. Hosted by Jermaine E. Whiteside, doctoral researcher and founder of AnointedEDU, each episode translates scholarly research into practical insights for educators, ministry leaders, nonprofit executives, public-sector professionals, and organizational decision-makers. Through conference presentations, research conversations, working papers, NotebookLM discussions, and executive education, the podcast examines governance science, adaptive leadership, Faithful Intelligence, AI ethics, implementation science, institutional trust, organizational resilience, and evidence-based leadership. Whether you are leading a church, nonprofit, educational institution, business, or government organization, The AnointedEDU Podcast provides research-informed ideas designed to help leaders build resilient, ethical,

Frequently asked questions

How long is this episode of Em Construção?

This episode is 1 hour and 3 minutes long.

When was this Em Construção episode published?

This episode was published on June 25, 2025.

Can I download this Em Construção episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.