Ep 63 Boeing 737 Max episode artwork

EPISODE · Nov 20, 2022 · 35 MIN

Ep 63 Boeing 737 Max

from FAILUROLOGY · host Nicole Imeson & Brian Moynihan

Engineering News – World’s First Electric Passenger Plane (1:45) This week’s engineering failure is the Boeing 737 Max (9:00). A poorly executed flight stabilization software called MCAS (15:20) caused two catastrophic crashes (25:30) putting Boeing in hot water (30:25). Check out our Patreon page for Mini Failure bonus episodes - https://www.patreon.com/failurology Photos/Sources/Summary from this episode - https://www.failurology.ca/ Ways to get in touch Twitter - https://twitter.com/failurology Email - [email protected] Linked In - https://www.linkedin.com/company/failurology-podcast YouTube - https://www.youtube.com/channel/UCh1Buq46PYyxKbCDGTqbsDg

Episode metadata supplied by the publisher feed · Published Nov 20, 2022

Embed this episode

Ready to play

Ep 63 Boeing 737 Max

0:00 35:44

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of FAILUROLOGY?

This episode is 35 minutes long.

When was this FAILUROLOGY episode published?

This episode was published on November 20, 2022.

Can I download this FAILUROLOGY episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!