Ep.700 - How to Create a Look-ahead Schedule episode artwork

EPISODE · Nov 30, 2022 · 8 MIN

Ep.700 - How to Create a Look-ahead Schedule

from Elevate Construction · host Jason Schroeder

In this podcast we cover:  Why creating your look-ahead first is wrong. How to vertically align your schedule. One is from your head, that other is from your team. If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode.  And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).   Also, here are links to our YouTube Channels: · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

Episode metadata supplied by the publisher feed · Published Nov 30, 2022

Embed this episode

NOW PLAYING

Ep.700 - How to Create a Look-ahead Schedule

0:00 8:33

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Elevate Construction?

This episode is 8 minutes long.

When was this Elevate Construction episode published?

This episode was published on November 30, 2022.

Can I download this Elevate Construction episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!