EPISODE · Dec 13, 2022 · 8 MIN
Ep.711 - Lean Onboarding Series - Takt, Last Planner, Scrum, & CPM
from Elevate Construction · host Jason Schroeder
In this podcast Jason showcases the difference between the four major scheduling systems on your construction project.
Embed this episode
NOW PLAYING
Ep.711 - Lean Onboarding Series - Takt, Last Planner, Scrum, & CPM
0:00
8:11
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Elevate Construction?
This episode is 8 minutes long.
When was this Elevate Construction episode published?
This episode was published on December 13, 2022.
Can I download this Elevate Construction episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!