Ep.714 - Lean Onboarding Series - The Last Planner System episode artwork

EPISODE · Dec 18, 2022 · 7 MIN

Ep.714 - Lean Onboarding Series - The Last Planner System

from Elevate Construction · host Jason Schroeder

In this podcast episode Jason explains two ways to look at the Last Planner System on your project.

Episode metadata supplied by the publisher feed · Published Dec 18, 2022

Embed this episode

NOW PLAYING

Ep.714 - Lean Onboarding Series - The Last Planner System

0:00 7:19

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Elevate Construction?

This episode is 7 minutes long.

When was this Elevate Construction episode published?

This episode was published on December 18, 2022.

Can I download this Elevate Construction episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!