Ep.785 - Elevating Construction Foremen - Recording Part 10
from Elevate Construction Hosted by Jason Schroeder
Jason continues reading Elevating Construction Foreman with A Month, Week, and Day in the Life of a Crew Leader, starting with organizing everything by zone and time. He covers the five schedule types a crew leader works with, how a pull plan is built, the quality pre-construction meeting, and the habit of studying drawings and specs every day. What you'll learn in this episode: Why work should be organized by zone and time, not by deliverables or scopes The five schedules a crew leader works with, from the master schedule to the day plan How a pull plan is built for one representative zone and repeated through the phase Why the quality pre-construction meeting must produce a checklist or visual board Why crew leaders should study drawings and specs for at least 15 minutes a day Do you walk out of your quality pre-con meeting with a checklist, or just a lot of talk? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
Embed this episode
No transcript yet.