Ep. 8 | From Prototype to Market: Design for Manufacturability with Untapped Engineering Resources episode artwork

EPISODE · Aug 25, 2020 · 35 MIN

Ep. 8 | From Prototype to Market: Design for Manufacturability with Untapped Engineering Resources

from Moore's Lobby: Where engineers talk all about circuits · host Dave Finch

In our eighth episode, host Dave Finch discusses how to get from prototype to market, zeroing in on the process of DFM or, more accurately DFX, which stands for "Design for" ...well, anything that comes after the design. Why does cost go up after a product's been released for a while? When should you consider certifcation in the design process? How can young engineers hope to familiarize themselves with DFM if they never even designed a full board in school? Learn the many good reasons engineers should know their board manufacturers. Consider how EMS (electronic manufacturing services) companies have evolved from mere contractors into design partners. And hear some truly unfortunate stories about what happens when you fail to plan beyond the circuit design stage appropriately.

Episode metadata supplied by the publisher feed · Published Aug 25, 2020

Embed this episode

NOW PLAYING

Ep. 8 | From Prototype to Market: Design for Manufacturability with Untapped Engineering Resources

0:00 35:25

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Moore's Lobby: Where engineers talk all about circuits?

This episode is 35 minutes long.

When was this Moore's Lobby: Where engineers talk all about circuits episode published?

This episode was published on August 25, 2020.

Can I download this Moore's Lobby: Where engineers talk all about circuits episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!