Data Center Design episode artwork

EPISODE · Feb 9, 2022 · 1H 49M

Data Center Design

from The Art of Network Engineering · host The Art of Network Engineering

In this episode, A.J. shares some of his experience overhauling IT for a small manufacturing company. Lexie and Andy ask questions and dig deeper into the process of revamping the entire IT infrastructure. We started this episode as a Data Center Design discussion, but we took a slight detour. We think you’ll enjoy it just the same Full show notes, transcript and links: https://artofnetworkengineering.com/episodes/ep-81-real-world-design-discussionSend us Fan Mail Support the showFor everything AONE:  https://artofnetworkengineering.com/

Episode metadata supplied by the publisher feed · Published Feb 9, 2022

Embed this episode

NOW PLAYING

Data Center Design

0:00 1:49:24

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Art of Network Engineering?

This episode is 1 hour and 49 minutes long.

When was this The Art of Network Engineering episode published?

This episode was published on February 9, 2022.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this The Art of Network Engineering episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!