Ep.847 - Get the Right Foremen on the Bus - Last Planner® Implementation Series episode artwork

EPISODE · Jun 21, 2023 · 15 MIN

Ep.847 - Get the Right Foremen on the Bus - Last Planner® Implementation Series

from Elevate Construction · host Jason Schroeder

In this podcast we cover: How to select the right Foremen. How you can interview and select them. What things they need to align with to properly support the project   If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode.  And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).   Also, here are links to our YouTube Channels: · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg 

Episode metadata supplied by the publisher feed · Published Jun 21, 2023

Embed this episode

NOW PLAYING

Ep.847 - Get the Right Foremen on the Bus - Last Planner® Implementation Series

0:00 15:49

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Elevate Construction?

This episode is 15 minutes long.

When was this Elevate Construction episode published?

This episode was published on June 21, 2023.

Can I download this Elevate Construction episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!