Skip to content
Ep.852 - Design Your Interaction Spaces - Last Planner® Implementation Series episode artwork

Jun 29, 2023 16 min

Ep.852 - Design Your Interaction Spaces - Last Planner® Implementation Series

from Elevate Construction Hosted by Jason Schroeder

Jason continues the Last Planner implementation series with the fifth checklist item: designing your conference room, trailer, and visuals. He compares a plan without the right visual environment to a great view with no window. He walks through the interaction spaces he designed with Greg Lowe at Oakland, including the work planning wall, permitting wall, war corner with a war table, kitchen, conference room, picture wall, and landing space, along with outdoor logistics like the staging area, craft lunchroom, bathrooms, hoist, and crane. His main point is that every meeting in the cycle needs a space and visuals that let the team discuss its agenda, and that the design of the trailer matters as much as the design of the building. He also shares where the podcast, YouTube channel, and LinkedIn stand, and what helps most. What you'll learn in this episode: Why the trailer and conference room are the window to your planning, and why a plan needs the right visuals to be seen The interaction spaces from the Oakland design: work planning wall, permitting wall, war corner, kitchen, conference room, picture wall, and landing space How to set up the room: two screens (Takt plan on one, zone maps, logistics, procurement, or roadblocks on the other), printed zone maps under plexiglass for trade partners to mark up, and guides on the back wall How to give every meeting in your cycle a place and visuals that fit its agenda, from the weekly tactical to the worker huddle How to support the podcast: share it, connect on LinkedIn, and subscribe to the Jason Schroeder YouTube channel Could a trade partner walk into your meeting room and see the plan, the zone maps, and the roadblocks without anyone explaining them? If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Ep.852 - Design Your Interaction Spaces - Last Planner® Implementation Series

0:00 16:05

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Elevate Construction?

This episode is 16 minutes long.

When was this Elevate Construction episode published?

This episode was published on June 29, 2023.

Can I download this Elevate Construction episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.