Ep.861 - The 6 Takt Steering & Control Strategies - Last Planner® Implementation Series

from Elevate Construction · host Jason Schroeder

In this podcast we cover: The process to follow after zone control walks. What the walks are looking for. What are the 6 strategies to create flow once you have identified a problem.   If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode.  And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).   Also, here are links to our YouTube Channels: · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg 

Episode metadata supplied by the publisher feed · Published Jul 12, 2023

Embed this episode

NOW PLAYING

Ep.861 - The 6 Takt Steering & Control Strategies - Last Planner® Implementation Series

0:00 13:45

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Elevate Construction?

This episode is 13 minutes long.

When was this Elevate Construction episode published?

This episode was published on July 12, 2023.

Can I download this Elevate Construction episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!