Ep.927 - When Last Planner® Becomes Un-Lean
from Elevate Construction Hosted by Jason Schroeder
Jason says some Last Planner ideas have stopped being lean because they've been frozen in time. He disputes the claim that plans are always wrong the further out they go, says the data supports it only for CPM, and argues for iterating the system and not going slow. He lists principles of Last Planner he agrees with and those he challenges. What you'll learn in this episode: Why the claim that all plans are wrong applies to CPM, not planning in general How Elevate keeps iterating, with 34 versions of the SuperPM boot camp and 18 of the FEP boot camp Why Last Planner pairs best with Takt and not CPM Why pull planning is only one part of running a project properly Why "go slow" is an excuse and why friction should be removed instead Is the system you use still improving, or has it been frozen in time? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
Embed this episode
No transcript yet.