Ep.935 - Target Your Fastest Pace
from Elevate Construction Hosted by Jason Schroeder
Jason explains how to target your fastest pace for procurement. He describes the macro Takt plan as the slowest baseline that validates duration and budget, and the norm level plan as the faster target with more buffer. Procurement must be based on the norm level or covered with a material inventory buffer so materials arrive in time. What you'll learn in this episode: Why the macro plan is a baseline and the norm level plan is the target Why this is one schedule trying to go faster, not two schedules Why procurement dates should follow the fastest pace Three ways to protect procurement: a buffer of 10% of the phase, simulating the norm, or waiting for the pull plan Why a material inventory buffer belongs in every procurement log Are you ordering materials for your baseline pace or your fastest pace? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
Embed this episode
No transcript yet.