Skip to content
EP7:合約書|必須詳列的保障!開工完工日、延遲罰則、追加折抵、付款方式、開發票 episode artwork

EPISODE · Feb 7, 2024 · 13 MIN

EP7:合約書|必須詳列的保障!開工完工日、延遲罰則、追加折抵、付款方式、開發票

from 窩只翻老屋不翻臉 · host 窩要成設計-老屋翻新連鎖第一品牌

✔合理的開工完工日? ✔如何確保追加折抵? ✔延遲罰則怎麼認定? ✔尾款什麼時候要付? ✔匯款帳戶要注意? ✔一定要開發票嗎? 🏠官網:https://wowhouse1115.com 🔷FB:https://www.facebook.com/wowhouse115 ✅官方Line:https://lin.ee/gWACJVH 👀YouTube:https://reurl.cc/xlgyoE 📌IG:https://www.instagram.com/wowhouse1115 Powered by Firstory Hosting

Episode metadata supplied by the publisher feed · Published Feb 7, 2024

Embed this episode

Ready to play

EP7:合約書|必須詳列的保障!開工完工日、延遲罰則、追加折抵、付款方式、開發票

0:00 13:59

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of 窩只翻老屋不翻臉?

This episode is 13 minutes long.

When was this 窩只翻老屋不翻臉 episode published?

This episode was published on February 7, 2024.

Can I download this 窩只翻老屋不翻臉 episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!