EPISODE · Mar 31, 2020 · 13 MIN
EP8 COVID-19: Insurance and Construction Projects (UK)
from Herbert Smith Freehills Kramer Podcasts · host Herbert Smith Freehills Podcasts
How are construction contracts currently being affected by the COVID-2019 coronavirus and what is the extent to which insurance cover might protect against losses?James Doe, Emma Schaafsma & Sarah McNally discuss these points in our latest podcast.
Embed this episode
NOW PLAYING
EP8 COVID-19: Insurance and Construction Projects (UK)
0:00
13:07
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Herbert Smith Freehills Kramer Podcasts?
This episode is 13 minutes long.
When was this Herbert Smith Freehills Kramer Podcasts episode published?
This episode was published on March 31, 2020.
Can I download this Herbert Smith Freehills Kramer Podcasts episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!