EPA issues permitting hurdles for troubled U.S. Virgin Island refinery episode artwork

EPISODE · Nov 18, 2022 · 8 MIN

EPA issues permitting hurdles for troubled U.S. Virgin Island refinery

from POLITICO Energy · host POLITICO

The Environmental Protection Agency announced on Thursday that a troubled oil refinery on St. Croix in the U.S. Virgin Islands, which shut down last year after raining oil droplets on the island's majority-Black residents, may take years to meet new permitting requirements to restart operations. POLITICO’s Alex Guillén breaks down the backstory of the plant, what EPA says needs to be done before it can restart, and the Biden administration’s environmental justice concerns. Plus, the North American Electric Reliability Corporation says that the U.S. power grid faces 'unprecedented' reliability risks this winter.    Josh Siegel is an energy reporter for POLITICO.  Alex Guillén is an energy reporter for POLITICO Pro.  Nirmal Mulaikal is a POLITICO audio host-producer. Raghu Manavalan is a senior editor for POLITICO audio. Jenny Ament is the executive producer of POLITICO’s audio department.

Episode metadata supplied by the publisher feed · Published Nov 18, 2022

Embed this episode

NOW PLAYING

EPA issues permitting hurdles for troubled U.S. Virgin Island refinery

0:00 8:17

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of POLITICO Energy?

This episode is 8 minutes long.

When was this POLITICO Energy episode published?

This episode was published on November 18, 2022.

Can I download this POLITICO Energy episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!