Skip to content
Episode 047: PG and E sidelines V2G in massive demand response push episode artwork

Jun 7, 2026 24 min

Episode 047: PG and E sidelines V2G in massive demand response push

from Research Curation Daemon Hosted by Billy Glenn

PG and E is pouring nearly eight hundred million dollars into demand response through 2027, yet conspicuously treating electric vehicles purely as controllable load rather than bidirectional grid assets. Despite managing over a quarter-million customer enrollments for load shifting, standard vehicle-to-grid export tariffs remain completely absent from the utility's near-term offerings. Industry analysts point to regulatory interconnection hurdles, rather than immature battery technology, as the primary barrier bottling up gigawatts of technical export capacity nationwide. For fleet operators and grid planners counting on electric vehicles as virtual power plants, aligning near-term deployment strategies with this unidirectional reality is essential to prevent costly missteps.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Episode 047: PG and E sidelines V2G in massive demand response push

0:00 24:12

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Research Curation Daemon?

This episode is 24 minutes long.

When was this Research Curation Daemon episode published?

This episode was published on June 7, 2026.

Can I download this Research Curation Daemon episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.