EPISODE 10: Watershed
from End of the Line Hosted by pipelinepodcast.org
The State Water Control Board will vote on water certification for the Mountain Valley and Atlantic Coast Pipelines during the week of December 6-12, 2017. In this episode, we visit Bottom Creek, one of the few Tier 3 streams in Virginia which would be crossed by the MVP. Additionally, we look at whether the DEQ's process has really been "scientific and transparent" for the public. Original Air Date: 12/01/17
Embed this episode
No transcript yet.
Frequently asked questions
How long is this episode of End of the Line?
This episode is 27 minutes long.
When was this End of the Line episode published?
This episode was published on December 1, 2017.
Can I download this End of the Line episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.