Episode 105 - Using AI to build AI, with James Stirrat-Ellis of Build episode artwork

EPISODE · Jun 18, 2026 · 37 MIN

Episode 105 - Using AI to build AI, with James Stirrat-Ellis of Build

from DCD Zero Downtime: The Bi-Weekly Data Center Show · host DatacenterDynamics

Data center site selection is a crucial step in the construction process, and picking the right piece of land can be the difference between a project succeeding and failing.For AI data center developers with money burning a hole in their corporate back pockets, separating the promising propositions from duds is a time-consuming business.Build thinks it can help with an AI-powered system that it says can help sift through potential sites to identify the best parcels of land.In this podcast, CEO James Stirrat-Ellis explains how his company's system combines artificial and human intelligence to speed up projects, and how it has worked with the UK government on its much-vaunted AI Growth Zones.

Episode metadata supplied by the publisher feed · Published Jun 18, 2026

Embed this episode

NOW PLAYING

Episode 105 - Using AI to build AI, with James Stirrat-Ellis of Build

0:00 37:32

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of DCD Zero Downtime: The Bi-Weekly Data Center Show?

This episode is 37 minutes long.

When was this DCD Zero Downtime: The Bi-Weekly Data Center Show episode published?

This episode was published on June 18, 2026.

Can I download this DCD Zero Downtime: The Bi-Weekly Data Center Show episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!