EPISODE 11 - Furnace Hot Spot Repair in the Live Tail Gas Incinerator Saves $156 Million episode artwork

EPISODE · Jan 16, 2024 · 5 MIN

EPISODE 11 - Furnace Hot Spot Repair in the Live Tail Gas Incinerator Saves $156 Million

from Efficiency and Reliability Audio Case Studies · host IGS

In this audio case study, discover how IGS's Hot Refractory Repair prevented a potential $156 million shutdown cost for a Central Asian oil and gas producer. It also highlighted the crucial role of proactive maintenance in sustaining uninterrupted energy production.

Episode metadata supplied by the publisher feed · Published Jan 16, 2024

Embed this episode

Ready to play

EPISODE 11 - Furnace Hot Spot Repair in the Live Tail Gas Incinerator Saves $156 Million

0:00 5:42

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Efficiency and Reliability Audio Case Studies?

This episode is 5 minutes long.

When was this Efficiency and Reliability Audio Case Studies episode published?

This episode was published on January 16, 2024.

Can I download this Efficiency and Reliability Audio Case Studies episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!