Episode 114 - Loop 101 Pima improvements complete; pavement upgrade coming episode artwork

EPISODE · Feb 6, 2026 · 15 MIN

Episode 114 - Loop 101 Pima improvements complete; pavement upgrade coming

from On The Road With ADOT · host ADOT

ADOT 's Doug Nintzel sits down with Resident Engineer Joe Heller to discuss the ongoing work being done on the Loop 101.

Episode metadata supplied by the publisher feed · Published Feb 6, 2026

Embed this episode

NOW PLAYING

Episode 114 - Loop 101 Pima improvements complete; pavement upgrade coming

0:00 15:16

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of On The Road With ADOT?

This episode is 15 minutes long.

When was this On The Road With ADOT episode published?

This episode was published on February 6, 2026.

Can I download this On The Road With ADOT episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!