EPISODE · Feb 6, 2026 · 15 MIN
Episode 114 - Loop 101 Pima improvements complete; pavement upgrade coming
from On The Road With ADOT · host ADOT
ADOT 's Doug Nintzel sits down with Resident Engineer Joe Heller to discuss the ongoing work being done on the Loop 101.
Embed this episode
NOW PLAYING
Episode 114 - Loop 101 Pima improvements complete; pavement upgrade coming
0:00
15:16
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of On The Road With ADOT?
This episode is 15 minutes long.
When was this On The Road With ADOT episode published?
This episode was published on February 6, 2026.
Can I download this On The Road With ADOT episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!