Episode 115 - Catching you up on the Loop 101 Agua Fria widening project episode artwork

EPISODE · Feb 13, 2026 · 8 MIN

Episode 115 - Catching you up on the Loop 101 Agua Fria widening project

from On The Road With ADOT · host ADOT

ADOT 's Doug Nintzel sits down with Kim Larson to discuss the ongoing work being done on the Loop 101 Agua Fria freeway.

Episode metadata supplied by the publisher feed · Published Feb 13, 2026

Embed this episode

NOW PLAYING

Episode 115 - Catching you up on the Loop 101 Agua Fria widening project

0:00 8:54

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of On The Road With ADOT?

This episode is 8 minutes long.

When was this On The Road With ADOT episode published?

This episode was published on February 13, 2026.

Can I download this On The Road With ADOT episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!