Episode 117 - Big Loop 303 improvements underway in the North Valley episode artwork

EPISODE · Feb 27, 2026 · 12 MIN

Episode 117 - Big Loop 303 improvements underway in the North Valley

from On The Road With ADOT · host ADOT

ADOT 's Doug Nintzel sits down with Resident Engineer Joe Heller to discuss the upcoming work on the I-17 and Loop 303.

Episode metadata supplied by the publisher feed · Published Feb 27, 2026

Embed this episode

NOW PLAYING

Episode 117 - Big Loop 303 improvements underway in the North Valley

0:00 12:39

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of On The Road With ADOT?

This episode is 12 minutes long.

When was this On The Road With ADOT episode published?

This episode was published on February 27, 2026.

Can I download this On The Road With ADOT episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!