Skip to content
EPISODE 12: Irreparable episode artwork

Feb 16, 2018 27 min

EPISODE 12: Irreparable

from End of the Line Hosted by pipelinepodcast.org

In this first episode of 2018, the pipeline fight is entering a new phase. Tree cutting begins in Buckingham County, and MVP takes 300 landowners to court. Original air date: 2/16/18

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

EPISODE 12: Irreparable

0:00 27:30

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of End of the Line?

This episode is 27 minutes long.

When was this End of the Line episode published?

This episode was published on February 16, 2018.

Can I download this End of the Line episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.