EPISODE · Feb 2, 2024 · 6 MIN
EPISODE 13 - How a Plant Stopped CFB Boiler Tube Repairs From 500 To 0
from Efficiency and Reliability Audio Case Studies · host IGS
In this audio case study, we'll talk about the changing maintenance strategy of the power plant operating two Circulating Fluidized Bed boilers. In 2015, they required 500 tube repairs across their units, leading to severe production disruptions. We'll explain why their boiler reliability was compromised and what they learned from it.
Embed this episode
Ready to play
EPISODE 13 - How a Plant Stopped CFB Boiler Tube Repairs From 500 To 0
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.