EPISODE 13 - How a Plant Stopped CFB Boiler Tube Repairs From 500 To 0 episode artwork

EPISODE · Feb 2, 2024 · 6 MIN

EPISODE 13 - How a Plant Stopped CFB Boiler Tube Repairs From 500 To 0

from Efficiency and Reliability Audio Case Studies · host IGS

In this audio case study, we'll talk about the changing maintenance strategy of the power plant operating two Circulating Fluidized Bed boilers. In 2015, they required 500 tube repairs across their units, leading to severe production disruptions. We'll explain why their boiler reliability was compromised and what they learned from it.

Episode metadata supplied by the publisher feed · Published Feb 2, 2024

Embed this episode

Ready to play

EPISODE 13 - How a Plant Stopped CFB Boiler Tube Repairs From 500 To 0

0:00 6:44

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Efficiency and Reliability Audio Case Studies?

This episode is 6 minutes long.

When was this Efficiency and Reliability Audio Case Studies episode published?

This episode was published on February 2, 2024.

Can I download this Efficiency and Reliability Audio Case Studies episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!