EPISODE 15 - How a Pulp and Paper CFB Boiler Mitigated Extreme Erosion and Saved Long-Term Costs episode artwork

EPISODE · Mar 12, 2024 · 16 MIN

EPISODE 15 - How a Pulp and Paper CFB Boiler Mitigated Extreme Erosion and Saved Long-Term Costs

from Efficiency and Reliability Audio Case Studies · host IGS

In this episode, we're joined by Kevin Phillips, Director of Business Development for Integrated Global Services and a Thermal Spray expert. He discusses a Pulp and Paper CFB Boiler dealing with extreme erosion issues, worsened by the presence of plastics, resulting in corrosion problems. The boiler experienced forced outages due to tube leaks, leading to frequent mechanical repairs. Fast forward six years later, and there are no tube leaks or forced outages. Items discussed in the episode:   Difference Between High Velocity Thermal Spray and Low Velocity The True Cost of Metallurgy Cladding for Pulp and Paper CFB Boilers The Dangers of Continued Forced Outages for CFB Boilers What Is the Duration of the Agreement or Partnership Between IGS and Its Clients?

Episode metadata supplied by the publisher feed · Published Mar 12, 2024

Embed this episode

Ready to play

EPISODE 15 - How a Pulp and Paper CFB Boiler Mitigated Extreme Erosion and Saved Long-Term Costs

0:00 16:21

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Efficiency and Reliability Audio Case Studies?

This episode is 16 minutes long.

When was this Efficiency and Reliability Audio Case Studies episode published?

This episode was published on March 12, 2024.

Can I download this Efficiency and Reliability Audio Case Studies episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!