Episode 17: Should We do Unplanned Work?
from take5IRL Podcast Hosted by agilityIRL
The Sprint Goal provides focus and direction for a Scrum Team and Sprint Planning aligns the team on the work of the Sprint. Should we ever do unplanned work that comes up during a Sprint? Tune in to this episode where Jeff and Mike share the importance of transparency and communication within a Scrum team before deviating from the Sprint plan.
Embed this episode
No transcript yet.
Similar podcasts
Frequently asked questions
How long is this episode of take5IRL Podcast?
This episode is 9 minutes long.
When was this take5IRL Podcast episode published?
This episode was published on August 8, 2023.
Can I download this take5IRL Podcast episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.