Skip to content
EPISODE 17: Still Here episode artwork

May 4, 2018 27 min

EPISODE 17: Still Here

from End of the Line Hosted by pipelinepodcast.org

"Nutty" has been living at the top of a 50 foot pole on the forest service road in Giles County for over 6 weeks. The forest service continues to impose order by drawing lines and then re-drawing them, and arresting anyone who crosses the line. Original air date: 5/4/18

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

EPISODE 17: Still Here

0:00 27:30

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of End of the Line?

This episode is 27 minutes long.

When was this End of the Line episode published?

This episode was published on May 4, 2018.

Can I download this End of the Line episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.