Episode 19: Feb 2-Feb 8 2026: Yonge Bus Detours and Sheppard Shutdown episode artwork

EPISODE · Feb 1, 2026 · 2 MIN

Episode 19: Feb 2-Feb 8 2026: Yonge Bus Detours and Sheppard Shutdown

from Ding Dang Dong · host Aza

Sewer work, signal upgrades, and some long-awaited good news! This episode of DING DANG DONG breaks down everything TTC riders need to know for the first full week of February. What's New The 97 Yonge bus is on a detour near St Clair Station due to sewer work—this one's sticking around until late February, so plan ahead What's Ending Some relief is finally here: 31 Greenwood bus returns to Greenwood Station on Sunday 504/304 King streetcar detour wraps up Monday 71 Runnymede bus gets back to normal by Tuesday after water pipe repairs Overnight & Weekend Closures 510 Spadina streetcar: Buses replace streetcars Monday–Thursday, 11 PM to 4 AM Line 1 (Finch to Eglinton): Early closure at 11 PM Monday–Thursday for tunnel work Line 4 Sheppard: Closed all day Saturday for signal work—shuttle buses will be running Whether you're a night owl or a weekend traveller, this episode has you covered. Tune in and stay ahead of the disruptions!

Episode metadata supplied by the publisher feed · Published Feb 1, 2026

Embed this episode

NOW PLAYING

Episode 19: Feb 2-Feb 8 2026: Yonge Bus Detours and Sheppard Shutdown

0:00 2:41

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Ding Dang Dong?

This episode is 2 minutes long.

When was this Ding Dang Dong episode published?

This episode was published on February 1, 2026.

Can I download this Ding Dang Dong episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!