Episode 224: Dagi Berhane – Building Data Centers Where There’s No Power, Water, or Patience episode artwork

EPISODE · Jun 19, 2025 · 1H 26M

Episode 224: Dagi Berhane – Building Data Centers Where There’s No Power, Water, or Patience

from The QTS Experience · host Dave McCall

What do you get when you mix solar panels, shipping containers, and sheer willpower? A data center in the wild. Dagi Berhane joins me to talk trust, technology, and why availability should come before sustainability. Also, what happens when your cloud has no internet? (Spoiler: Dagi builds one.) Guest Links Dagi Berhane’s LinkedIn: https://www.linkedin.com/in/dagi-berhane/ Salesforce Website: https://www.salesforce.com/ References & Studies Mentioned Salesforce 1-1-1 Philanthropic Model: https://www.salesforce.com/company/philanthropy/ Red Fox Data Center Initiative: https://redfoxsolutionsgroup.com/ The Innovator’s Dilemma by Clayton Christensen: https://www.hbs.edu/faculty/Pages/item.aspx?num=46 Habitat for Humanity: https://www.habitat.org/

Episode metadata supplied by the publisher feed · Published Jun 19, 2025

Embed this episode

Ready to play

Episode 224: Dagi Berhane – Building Data Centers Where There’s No Power, Water, or Patience

0:00 1:26:49

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The QTS Experience?

This episode is 1 hour and 26 minutes long.

When was this The QTS Experience episode published?

This episode was published on June 19, 2025.

Can I download this The QTS Experience episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!