Episode 31: Fail to plan, plan to fail episode artwork

EPISODE · Aug 8, 2024 · 20 MIN

Episode 31: Fail to plan, plan to fail

from SteelCast · host Tata Steel UK

As the company transitions to low CO2 steelmaking, the £1.25 billion investment over the coming three years inevitably involves things to be built, extended and modified on site – not least the electric arc furnace itself. The complex and in-depth planning process has been worked upon for months, with the aim of being submitted in November 2024 and the hope of getting spades in the ground in the summer of 2025. Digital and Brand Specialist, Gareth Brookes speaks to Head of Legal Property, Natalie Young to find out more. Watch this episode on YouTube: https://www.youtube.com/@TataSteelUK Follow Tata Steel UK on social media: Twitter: https://www.twitter.com/tatasteeluk Facebook: https://www.facebook.com/tatasteeluk Instagram: https://www.instagram.com/tatasteeluk/ LinkedIn: https://www.linkedin.com/company/tata-steel-uk-ireland

Episode metadata supplied by the publisher feed · Published Aug 8, 2024

Embed this episode

NOW PLAYING

Episode 31: Fail to plan, plan to fail

0:00 20:37

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of SteelCast?

This episode is 20 minutes long.

When was this SteelCast episode published?

This episode was published on August 8, 2024.

Can I download this SteelCast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!