Episode 32: Special guest host Paul Minhas with President and CEO of Waves Coffee House, wastewater treatment plant cost overruns & golden parachutes episode artwork

EPISODE · Jun 24, 2024 · 1H 19M

Episode 32: Special guest host Paul Minhas with President and CEO of Waves Coffee House, wastewater treatment plant cost overruns & golden parachutes

from For the Record with Daniel Fontaine & Paul Minhas · host Daniel Fontaine

Special host Paul Minhas conducts an exclusive interview with Kayvan Rahmati, President and CEO of Waves Coffee House. They talk about the business climate in New West, patios and economic development. We also find out how Waves got its name and which public figure Kayvan most respects! We also bring back the popular "Bell or Buzzer" game and have Kayvan attempt to get all 4 responses right! Did he make it into the VIP Bell or Buzzer Club?Minhas also turns the tables on Coun. Daniel Fontaine and gets to know what got him into politics. He also puts Fontaine on the spot with a tough question about his future political ambitions. A number of media segments are also featured from Global TV and CKNW regarding golden parachutes for a former mayor and the ongoing financial debacle at the north shore wastewater treatment plant. It's an episode you will want to download and share with your family and friends!

Episode metadata supplied by the publisher feed · Published Jun 24, 2024

Embed this episode

Ready to play

Episode 32: Special guest host Paul Minhas with President and CEO of Waves Coffee House, wastewater treatment plant cost overruns & golden parachutes

0:00 1:19:05

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of For the Record with Daniel Fontaine & Paul Minhas?

This episode is 1 hour and 19 minutes long.

When was this For the Record with Daniel Fontaine & Paul Minhas episode published?

This episode was published on June 24, 2024.

Can I download this For the Record with Daniel Fontaine & Paul Minhas episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!