Episode 32 - The First Transoceanic Cable episode artwork

EPISODE · Sep 28, 2017 · 37 MIN

Episode 32 - The First Transoceanic Cable

from The Natural Curiosity Project · host Dr. Steven Shepard

The first submarine communications cable was laid across the northern Atlantic in the 1800s. The project was plagued by intrigue, sabotage, nasty winter storms, and the fact that there was no ship in existence at the time that could hold all the cable required to cross the ocean. What to do?

The first submarine communications cable was laid across the northern Atlantic in the 1800s. The project was plagued by intrigue, sabotage, nasty winter storms, and the fact that there was no ship in existence at the time that could hold all the cable required to cross the ocean. What to do?

NOW PLAYING

Episode 32 - The First Transoceanic Cable

0:00 37:37

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of The Natural Curiosity Project?

This episode is 37 minutes long.

When was this The Natural Curiosity Project episode published?

This episode was published on September 28, 2017.

What is this episode about?

The first submarine communications cable was laid across the northern Atlantic in the 1800s. The project was plagued by intrigue, sabotage, nasty winter storms, and the fact that there was no ship in existence at the time that could hold all the...

Can I download this The Natural Curiosity Project episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.