EPISODE · Jan 9, 2025 · 3 MIN
EPISODE 40 - Improving Boiler Reliability at a Texas Power Plant
from Efficiency and Reliability Audio Case Studies · host IGS
In this audio case study, we discuss how a Texas power plant with two CFB boilers overcame severe tube metal erosion and unpredictable wear rates by adopting IGS’ SMARTGard® High Velocity Thermal Spray solution.
Embed this episode
Ready to play
EPISODE 40 - Improving Boiler Reliability at a Texas Power Plant
0:00
3:09
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Efficiency and Reliability Audio Case Studies?
This episode is 3 minutes long.
When was this Efficiency and Reliability Audio Case Studies episode published?
This episode was published on January 9, 2025.
Can I download this Efficiency and Reliability Audio Case Studies episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!