Episode 40 - Plenty of submarine cables in the sea with Elena Badiola, Exa Infrastructure episode artwork

EPISODE · Sep 14, 2023 · 37 MIN

Episode 40 - Plenty of submarine cables in the sea with Elena Badiola, Exa Infrastructure

from DCD Zero Downtime: The Bi-Weekly Data Center Show · host DatacenterDynamics

Ever wondered about the practical challenges of connecting our continents? In this podcast episode, we talk with Exa Infrastructure's Elena Badiola about the process of getting subsea cables underwater: from environmental surveys to climate change, to funding challenges. Elena also shares her experience of living on a cable ship for five weeks after an earthquake caused an outage - and how a military coup almost stopped her from getting back home.

Episode metadata supplied by the publisher feed · Published Sep 14, 2023

Embed this episode

NOW PLAYING

Episode 40 - Plenty of submarine cables in the sea with Elena Badiola, Exa Infrastructure

0:00 37:27

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of DCD Zero Downtime: The Bi-Weekly Data Center Show?

This episode is 37 minutes long.

When was this DCD Zero Downtime: The Bi-Weekly Data Center Show episode published?

This episode was published on September 14, 2023.

Can I download this DCD Zero Downtime: The Bi-Weekly Data Center Show episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!