EPISODE 41 - How a Petrochemical Plant Avoided $12 Million in Losses episode artwork

EPISODE · Jan 21, 2025 · 2 MIN

EPISODE 41 - How a Petrochemical Plant Avoided $12 Million in Losses

from Efficiency and Reliability Audio Case Studies · host IGS

A petrochemical plant battled over 10 hotspots on a roof-fired reformer, exposed flames, and the threat of a $12 million loss—see how they avoided a full shutdown.

Episode metadata supplied by the publisher feed · Published Jan 21, 2025

Embed this episode

Ready to play

EPISODE 41 - How a Petrochemical Plant Avoided $12 Million in Losses

0:00 2:09

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Efficiency and Reliability Audio Case Studies?

This episode is 2 minutes long.

When was this Efficiency and Reliability Audio Case Studies episode published?

This episode was published on January 21, 2025.

Can I download this Efficiency and Reliability Audio Case Studies episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!