Episode 41: SPI Causeway Malfunction, SPI Blue Dragon, Donna Lake Fish Removal episode artwork

EPISODE · Feb 20, 2024 · 30 MIN

Episode 41: SPI Causeway Malfunction, SPI Blue Dragon, Donna Lake Fish Removal

from Talk R.G.V. Podcast · host mikesingleterry

South Padre Island Queen Isabella Causeway Closed due to Safety Gate malfunction South Padre Island Rare Blue Dragon Sea Slug wash up on North Side Beach. Environmental Protection Agency Crew Remove 5400 Contaminated Fish from Donna Lake We also have a dad joke of the day and a Talk RGV Food Review.

Episode metadata supplied by the publisher feed · Published Feb 20, 2024

Embed this episode

NOW PLAYING

Episode 41: SPI Causeway Malfunction, SPI Blue Dragon, Donna Lake Fish Removal

0:00 30:55

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Talk R.G.V. Podcast?

This episode is 30 minutes long.

When was this Talk R.G.V. Podcast episode published?

This episode was published on February 20, 2024.

Can I download this Talk R.G.V. Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!