Skip to content
Episode 43 episode artwork

Apr 15, 2024 19 min

Episode 43

from Asia Pacific Defence Reporter

First we noticed a small piece of good news that a Wollongong-based steel manufacturer has landed a contract with a US submarine builder, but it’s likely to be very small. Which prompts the question: where is the $30 billion going that Defence Industry Minister Pat Conroy says will be spent in Australia for AUKUS Pillar 1 – and it doesn’t take much to figure out that at least the first $10 billion is going on digging ditches and filling them with concrete. Not a lot of value adding there. The Defence budget, when used properly, can be a powerful tool for investing directly in the Australian economy. Very few governments understand that – and the current one appears clueless. Next – the looming disaster of the General Purpose Frigate. This is already a mess because not only is the media being kept in the dark but far more seriously the companies themselves have been forbidden from any contact with Australian industry. Let’s have a quick recap of how Australia successfully managed naval shipbuilding in the mid 1990s. Finally – an alternate future: the RAN could have started taking delivery in 2026 of the first of a class of powerful, missile firing corvettes. Instead we get nothing.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Episode 43

0:00 19:46

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Asia Pacific Defence Reporter?

This episode is 19 minutes long.

When was this Asia Pacific Defence Reporter episode published?

This episode was published on April 15, 2024.

Can I download this Asia Pacific Defence Reporter episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.