Episode 48: Lion Electric Vehicles at Clarius Park Joliet episode artwork

EPISODE · Dec 9, 2022 · 36 MIN

Episode 48: Lion Electric Vehicles at Clarius Park Joliet

from JLL Chicago Industrial Real Time

Episode 48 is live from the new home of Lion Electric Vehicles at Clarius Park Joliet. We are joined by Michael Connor from JLL and Clarius Partners' Eric Johnson to hear about JLL's involvement with Building I and the development and leasing of the 906,517 sq. ft. manufacturing facility.   This location will become Lion Electric's first manufacturing facility in the US and a showcase for consumers. Lion Electric was attracted to Joliet for its robust logistics industry, labor force and the Illinois Climate Change Policy which aligns well with the electric vehicle market. When the project started, the team knew it would have a big economic impact due to the amount of power and parking needed to support the plant. There was a tremendous amount of effort to take a speculative shell building and adapt it for producing zero emission vehicles.  Hear how the team pivoted in the middle of construction to add in over 100,000 square feet of office space, cranes, paint booths and reconfigured loading docks in our latest episode.

Episode metadata supplied by the publisher feed · Published Dec 9, 2022

Embed this episode

NOW PLAYING

Episode 48: Lion Electric Vehicles at Clarius Park Joliet

0:00 36:16

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of JLL Chicago Industrial Real Time?

This episode is 36 minutes long.

When was this JLL Chicago Industrial Real Time episode published?

This episode was published on December 9, 2022.

Can I download this JLL Chicago Industrial Real Time episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!