Episode 48 - Toronto Under Construction with Laurie Payne from Osmington Gerofsky Development Corp (OGDC) episode artwork

EPISODE · Mar 23, 2023 · 1H 13M

Episode 48 - Toronto Under Construction with Laurie Payne from Osmington Gerofsky Development Corp (OGDC)

from Toronto Under Construction · host Toronto Under Construction

Laurie Payne from Osmington Gerofsky Development Corp (OGDC) joins episode 48 of the Toronto Under Construction podcast to discuss planning, city building, Toronto community housing, financing infrastructure and building transit oriented communities. *Sponsored by: BCGi Baron Consulting Group Executive Search*

Episode metadata supplied by the publisher feed · Published Mar 23, 2023

Embed this episode

NOW PLAYING

Episode 48 - Toronto Under Construction with Laurie Payne from Osmington Gerofsky Development Corp (OGDC)

0:00 1:13:55

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Toronto Under Construction?

This episode is 1 hour and 13 minutes long.

When was this Toronto Under Construction episode published?

This episode was published on March 23, 2023.

Can I download this Toronto Under Construction episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!