EPISODE · May 2, 2025 · 3 MIN
EPISODE 49 - Cleaning Fouled Convection Tubes at a US Methanol Plant
from Efficiency and Reliability Audio Case Studies · host IGS
In this episode, we cover a recent project at a methanol plant in the US where fouling in the primary reformer convection section reduced efficiency. We explain how precision cleaning restored heat transfer, improved steam output, and cut emissions—saving the plant up to $500,000 annually.
Embed this episode
Ready to play
EPISODE 49 - Cleaning Fouled Convection Tubes at a US Methanol Plant
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.